ABA Associates runs as an extension of your own organisation: a remote project management and design office that plans, coordinates, documents and controls your project from feasibility to handover — working entirely to your standards, policies and reporting lines. More than task-based outsourcing — a dedicated extension of your project team.
“Projects rarely fail from a lack of technical expertise. They fail when coordination is absent.”
After 25+ years across design consultancy, construction, project management and manufacturing, we have seen the same pattern repeat: capable designers and competent contractors, yet projects that slip on cost, time and quality — because no single discipline is holding the whole together.
That coordinating discipline is what our remote office provides. We don't sell drawings by the hour. We operate the function that keeps a project aligned — the invisible architecture behind its success.
We operate as a back-office department — a project management office and a design office working side by side. Every task is executed to the SOPs, policies and approval limits you provide. You retain ownership, verification and final authority; we carry the workload, the coordination and the documentation.
Feasibility, planning, scheduling, cost control, procurement, billing verification, vendor management, progress reporting and closeout — the coordinating engine of the project.
Design development, CAD and technical drawings, BOQs and quantity take-offs, shop and construction drawings, and 3D visualisation — informed by real construction experience.
We work to your standards and jurisdiction. If your office in Australia sets a policy, our Pakistan office executes to it and returns the work for your verification and release. Where local professional registration or statutory sign-off is required, your locally authorised professional remains responsible for verification and release.
Project management begins at conception, not at construction. Our remote office can carry the project across its full lifecycle, or take on the specific stages where you need additional capacity.
Alongside project delivery, our office can carry the recurring administrative load — always as a processing function under your instructions, never as a transfer of legal responsibility.
The biggest concern with remote support is exposure of pricing, client identities and commercial intelligence. We answer it with a system, not a slogan.
Genuine ABA Associates deliverables — drawings, plans, renders and quantity documentation from real projects.
From annotated drawing to realised design — the same structure, drawn and visualised in-house.
You share drawings, requirements and the deliverables you need.
We review the scope and clarify the technical and reporting requirements.
Scope, schedule and commercial terms are agreed and documented.
Our office develops the drawings, documentation and project controls to your SOPs.
Comments and coordination requirements are incorporated in agreed cycles.
Completed work is issued in your required format for your verification and release.
There is no fixed commitment. Start with a single deliverable and scale up, or hand us the full project office from day one — the scope is built around your requirement.
An end-to-end remote department carrying your project from feasibility to handover — planning, design, controls, procurement, documentation and reporting under one arrangement.
Specific scopes — large or small — such as a BOQ, a drawing set, a project schedule or a monthly reporting function. Ideal for adding capacity to an existing team.
A standing arrangement where our office supports your projects continuously — a dependable extension of your team, scaled up or down as your workload moves.
By carrying your project office remotely, we let consultants and contractors reduce fixed overhead and project team cost — sharpening the numbers behind a tender or bid without losing coordination, documentation or control.
Whether it's a single package or an ongoing project office, tell us what you're delivering and we'll show you how our remote team can carry it.