Building Diagnostic — the help desk
At design stage, under construction, newly built or standing for years. Whether you are the owner, the contractor, the consultant or the project manager — if something is troubling you and you are not certain what it is, bring it to us. We will look at it properly and tell you what we think, in plain words. There is no charge, and nothing on this page is for sale. It is a help desk, backed by the full technical and engineering experience of this firm.
And it is as much for the small job as the large one. A family adding a single room, who cannot carry the cost of a consultant, is as welcome here as a developer building a tower.
When a wall cracks, the owner usually has nobody to ask. So the question goes to whoever is nearest — and the answer arrives as a quotation rather than an explanation. Nobody establishes whether the crack is plaster shrinkage, thermal movement, or a foundation that is still settling, and those three need entirely different treatment.
The crack is filled, it returns, and the next man blames the last one.
What we see, repeatedlyBring us the question and we will answer it as engineers — what is happening, why, and whether it matters. If the honest answer is that nothing needs doing, that is what you will be told.
Guidance, given the way a senior colleague would give it.
Cracking in walls, beams, columns and slabs. Settlement, deflection and the difference between a crack that is finished moving and one that is not. Where it matters, we set up monitoring rather than guess.
Roof and terrace leakage, bathroom and kitchen seepage, rising damp, basement water ingress, and failed waterproofing. Tracing where water is actually entering, which is rarely where the stain appears.
Loading and distribution, earthing, ageing wiring, and plumbing that is undersized or wrongly routed. The failures that are invisible until they are urgent.
Flooring, plaster, paint, tiling and joinery that has failed early. Usually a specification or application problem rather than a material problem — and worth establishing before it is redone the same way.
A condition survey before you commit to a property, so you know what you are taking on and can negotiate against it. Commonly requested by overseas buyers who cannot inspect in person.
A second opinion on drawings, specifications or an estimate before you sign. Quantities checked against the drawings, rates sense-checked, and the items that are quietly missing from the bill.
Bearing capacity, differential settlement, foundations on filled or reclaimed ground, and basements in a high water table. Which soil investigation is actually called for, how deep, and how to read the report when it comes back.
Grade and mix design, cover to reinforcement, curing failures, honeycombing, segregation, cold joints, and corrosion of reinforcement. Non-destructive testing — rebound hammer, UPV, core cutting — and what each can and cannot prove.
Where a member is found deficient: jacketing, section enlargement, external plate or fibre wrapping, grouting and crack injection. Which method suits which failure, and the sequence of propping and load relief that has to come first.
For contractors and consultants: variation and extension-of-time arguments that turn on a technical fact, defect allegations, and disagreements over specification compliance. We will tell you what the engineering position is. We do not take sides and this is not legal advice.
Electrical load and distribution, earthing and lightning protection, fire separation and means of escape, lift and HVAC provision, and where a building no longer meets the standard it was designed to.
Whichever way suits you.
An engineer reads it, not a salesman.
In plain words, with nothing attached.
Most construction disputes in Pakistan are not engineering failures. They are payment and scope failures — money paid too early, work not defined clearly, and no agreement on what happens when something goes wrong. We set this down here because it is the knowledge that saves people the most money, and because nobody tells them. Use it with whichever contractor you choose.
Payment tied to work actually completed and verified, not to the calendar and not to the contractor's cash flow. The single most effective protection available to a building owner.
What is included, what is excluded, which materials and which standard. Most disputes come from what nobody wrote down.
On a job of any size, an advance guarantee, a performance guarantee and a retention held until the defects period expires. Ask us what each one is for and how it should be worded — most owners have never been told these exist.
These are standard commercial documents prepared from engineering and project management practice. They are not legal advice, and for a high-value contract we will tell you plainly when a lawyer should review them.
People often assume that the moment an engineer is involved, laboratories and bills follow. Usually they do not. The great majority of what comes to this desk can be understood from a clear photograph, a few questions and some experience.
Occasionally a test is genuinely the only way to settle a matter. If that is so, we will say which one, why it is needed and what it will prove — and if it is not needed, we will tell you that just as plainly, which is more often the case.
Nothing on this page leads anywhere you have not chosen to go. Take what we tell you to your own contractor, your own consultant, or nobody at all.
If you would rather ABA carried out the work, that is a separate matter and it begins on the services page, in your own time.
Tell us what is happening. The more detail you give, the more useful the answer — and in a good many cases we can tell you straight away that it is nothing to worry about.